The pictures show the process of making the mural from the first planning drawings through the wet clay stage, to the completed assembled pieces. At this stage the pieces are left until completely dry, then fired, reassembled and cemented in place.
Sunday, 30 October 2011
Thursday, 20 October 2011
Raku at Tracy's
Friday, 14 October 2011
Rebuilding the Kiln
Although these picture are in the wrong order you can see the process of rebuilding and the work that it took to have the kiln that we use today.
Sunday, 9 October 2011
Alberta Summer Games 1995
The tiles were made by the children at the summer games and took all winter to fire. They were installed the following summer by guild members.
Friday, 7 October 2011
Pictures Continued
I cannot identify many of these pictures but they will have meaning to those that remember the events.
Monday, 3 October 2011
Old Photos
I found these articles from a file marked 1979 although I don't think one picture is from that date. I will post the rest of that file in the next post.
Subscribe to:
Posts (Atom)